Albury, NSW conducts Modular Infrastructure for Biological Services pilot with commercial food waste
Albury, NSW Modular Infrastructure for Biological Services
Australian firm Goterra installed a MIBS system at the Albury Waste Management Centre for a six-month pilot. Black soldier fly larvae within the system convert commercial food waste into soil conditioner in less than two weeks. City officials anticipate 1,800 tons of food waste will be diverted from local landfills during the pilot. This project evaluates a low-cost method for Albury as it seeks 100% food waste diversion by 2025.
Links
Digne d'intérêt
Maggots on the move at Albury - Inside Local Government
Keeping food waste out of landfill using the organic power of maggots is now a reality thanks to a new Modular Infrastructure for Biological Services (MIBS) system at Albury Waste Management Centre. Mayor, Kylie King said Albury was leading the way in innovative waste management as the first council in Australia to host the system. […]
Goterra Albury Receives its First Waste Delivery - Goterra
On Jan 17th, 2022 Goterra Albury, located at the Albury Waste Management Centre, received its first delivery of Food Organics from Veolia.
Plus de Albury
Projets liés
🚫 Pour rejoindre la discussion, inscrivez-vous. C'est gratuit !