voir la traduction
Leduc, AB continues fleet replacement program with the city's first plug-in Zamboni
Leduc, AB Plug-in Zamboni Fleet Replacement Program
Terminé
The all-electric ice resurfacer provides low-emissions and low-maintenance services at the Leduc Recreation Centre. An on-site charging station powered by solar energy keeps the Zamboni operating at key moments. The city anticipates a 30% reduction in maintenance costs and carbon emission savings of 5 tons per year. Facilities staff will evaluate the first Zamboni's performance as they plan long-term replacements for its fleet.
Plus de Leduc
Projets liés
🚫 Pour rejoindre la discussion, inscrivez-vous. C'est gratuit !