zie vertaling
Vancouver, BC opens Canada's first fire station to meet national zero-carbon building standards
Vancouver, BC First Fire Station Zero-Carbon Standards
Voltooid
The new Firehall 17 eliminates 99.67% of operational emissions created by its predecessor through better design. A draft-free structure, water recovery systems, and ground-source heat pumps improve on the standard firehall. Radio and IT infrastructure within the firehall support its use as a post-disaster communications hub. Vancouver earned LEED Gold and Net Zero Energy certification for the project with Passive House certification in progress.
Meer van Vancouver
Gerelateerde projecten
🚫 Registreer om deel te nemen aan de discussie. Het is gratis!