zie vertaling
Greater Geelong, VIC protects against fires at garden waste facility with temperature sensors
Greater Geelong, VIC Waste Facility Temperature Sensors
Voltooid
Greater Geelong processes 35,000 tons of garden waste per year at two organic collection facilities. Council officials and Sequence Digital began the development of the RM1 sensor for the Anakie facility in 2018. The RM1 features 4G connectivity, a weather-proof casing, and solar panels for off-grid power. Council employees monitor real-time sensor data for spikes preceding compost fires, thus supporting preventive measures across a 10,000 cubic meter facility.
Meer van Greater Geelong
Gerelateerde projecten
🚫 Registreer om deel te nemen aan de discussie. Het is gratis!