вижте превод
Marin County, CA looks to portable pumps to combat flooding
Планиране
Marin City is set to receive a portable flood pump station aimed at mitigating severe localized flooding. The Marin County Flood Control and Water Conservation District has allocated $1.37 million for the construction of the station's underground components. Expected to be operational by mid-winter, this initiative marks the beginning of broader flood risk reduction efforts in the area, which will include a permanent pump station and additional flood mitigation infrastructure.
Свързани Проекти
🚫 За да се присъедините към дискусията се регистрирайте. Безплатно е!