Alle Projekte
Übersetzung anzeigen

Leduc, AB continues fleet replacement program with the city's first plug-in Zamboni

Leduc, AB Plug-in Zamboni Fleet Replacement Program

Abgeschlossen

The all-electric ice resurfacer provides low-emissions and low-maintenance services at the Leduc Recreation Centre. An on-site charging station powered by solar energy keeps the Zamboni operating at key moments. The city anticipates a 30% reduction in maintenance costs and carbon emission savings of 5 tons per year. Facilities staff will evaluate the first Zamboni's performance as they plan long-term replacements for its fleet.

LA

Leduc, AB

City in Alberta

CA flag

Canada

Neues

Ci

City introduces electric Zamboni to ice re-surfacing fleet | City of Leduc

Levelling ice surfaces at the Leduc Recreation Centre in the City of Leduc will be more efficient and cost effective with the recent arrival of the city’s first ever electric powered Zamboni. The new machine, which is the first of its size in Alberta, was added to the city’s fleet in March 2021 and is expected to improve ice quality for users while reducing fuel costs and water consumption.

Mehr von Leduc

Leduc, AB turns Eco Station into a self-sustaining facility with rooftop solar installation

Verwandte Projekte

Louisville, CO adopts fully electric waste management fleet
Bruxelles [Brussels], BCR transitions horse-drawn carriages to electric

🚫 Um sich an der Diskussion zu beteiligen, registrieren Sie sich kostenlos!

  • About
  • Advertise
  • Hilfe
  • Blog
  • Nutzungsbedingungen
  • Datenschutz
  • Cookie-Richtlinie
  • Kontakt

© 2024 Govlaunch Inc.