All Projects

Paris, IDF and Enedis reduce carbon emissions created by events with electrical terminals

Paris, IDF Enedis Electrical Terminals Reduce Carbon Events

Complete

Six electrical terminals will be installed throughout Paris ahead of the 2024 Olympic and Paralympic Games. Each in-ground terminal can be raised and lowered based on the needs of public event organizers. Terminals at the Trocadéro, Place de la Concorde, and Champ de Mars replace diesel-powered generators used in the past for mobile power. The project reduces carbon dioxide emissions by 90% compared to diesel and provides power for community events beyond 2024.

PI

Paris, IDF

Commune in Île-de-France

FR flag

France

Newsworthy

Vd

Ville de Paris

Ee

Energy-saving electrical power terminals to be installed in time for Paris 2024

Electricity company Enedis is installing electrical terminals across Paris prior to the city's hosting of the 2024 Olympic and Paralympic Games in what is described as a "true illustration of the legacy" of the events.

More from Paris

Paris, IDF unifies e-scooter charging and docking infrastructure across operators with DUCKT pilot

Related Projects

Vincent, WA partners with Cerclos to drive low carbon designs of low to medium scale dwellings
Wagga Wagga, NSW trials plastic mesh reinforcement technology during road rehabilitation process

🚫 To join the discussion, sign up. It's free!

  • About
  • Advertise
  • Help
  • Blog
  • Terms of Service
  • Privacy
  • Cookie Policy
  • Contact

© 2024 Govlaunch Inc.