All Projects

Greater Geelong, VIC protects against fires at garden waste facility with temperature sensors

Greater Geelong, VIC Waste Facility Temperature Sensors

Complete

Greater Geelong processes 35,000 tons of garden waste per year at two organic collection facilities. Council officials and Sequence Digital began the development of the RM1 sensor for the Anakie facility in 2018. The RM1 features 4G connectivity, a weather-proof casing, and solar panels for off-grid power. Council employees monitor real-time sensor data for spikes preceding compost fires, thus supporting preventive measures across a 10,000 cubic meter facility.

GG

Greater Geelong, VIC

City in Victoria

AU flag

Australia

Newsworthy

More from Greater Geelong

Greater Geelong, VIC protects grey-headed flying foxes in local park with smart irrigation system
Greater Geelong, VIC undertakes food organics collection pilot ahead of citywide adoption

Related Projects

Glendale, AZ uses vehicle telematics technology to streamline garbage collection
Surprise, AZ pilots 3D printing technology to reduce and reuse plastic waste

🚫 To join the discussion, sign up. It's free!

  • About
  • Advertise
  • Help
  • Blog
  • Terms of Service
  • Privacy
  • Cookie Policy
  • Contact

© 2024 Govlaunch Inc.